East Alley Water Main and Sanitary Replacement

Project Scope:

This project is located between E Van Emmon St and E Hydraulic Ave behind the 208 - 226 S Bridge St block.

The water main  and sanitary project involves the replacement of approximately 367 feet of 6-inch ductile iron water main upsized to 8-inch and the lining of the surrounding buildings' existing sanitary sewer services. The project will include the reconstruction of eight (8) buildings water and sewer services. This project includes the installation of sewer cleanouts, curb removal and replacement, pavement patching, and restoration.  

Once the new main has been completed and tested, new water services will be tapped and old services will be switched over to the new main at the shut-off valve, (b-box or buffalo box). The roadway and parking lot  will be patched and landscaped areas restored once construction is completed.

During construction, there may be temporary disruptions to  traffic and access to properties, businesses, and parking lots. 

Story Map Outlining Project

Project Schedule:

October 2025 - November 2025

Contractor:

TBD

Project Contact Information:

Name: Kyle Welte

Title: Project Manager

Company: Engineering Enterprises, Inc.

Email: kwelte@eeiweb.com

Phone Number: 630-466-6776