- Home
- Government
- Departments
- Community Development
- Current Projects & Public Hearings
Current Projects & Public Hearings
In an effort to keep all interested parties informed, The United City of Yorkville Community Development Department will be continually posting information on current major development projects with public hearing requests. Projects will be posted when proposed and progress may be updated throughout construction. Tentative public hearing dates will be posted as soon as possible.
For additional information please contact Krysti Barksdale-Noble, Community Development Director at knoble@yorkville.il.us or by calling 630-553-8573.
Proposed Projects and Public Hearings
Below is a list of proposed projects and public hearings. Click on the title below or on the left side menu to get more information:
PZC 2025-07 Project Steel Data Center Campus (Annex Agreement, Rezone, Preliminary PUD & PUD)
Prologis, L.P., as the petitioner and contract purchaser, along with property owners Rosenwinkel Family Trust, George Ostreko Jr. Et Al, Mary Auer, and Jerry G. and Marilee Foltz, have submitted applications to the United City of Yorkville, Kendall County, Illinois, requesting annexation, annexation agreement, rezoning, special use authorization for a Planned Unit Development (PUD), and preliminary PUD Plan approval for approximately 540 acres across sixteen (16) parcels. The proposal aims to rezone the parcels from R-1 Single-Family Suburban Residence District to M-2 General Manufacturing District to facilitate the development of a high-tech data center campus, which will include twenty-four (24) data center buildings totaling over 9 million square feet, three (3) electrical substations, and associated stormwater detention basins. Requested deviations from the Yorkville Unified Development Ordinance (UDO) include modifications to interior yard setbacks, energy use standards, minimum parking requirements, cross access, pedestrian circulation, bicycle parking, off-street loading spaces, landscaping, mechanical unit screening, fencing, industrial appearance standards, frontage on public streets, and public street and circulation requirements. The subject property is generally located east of Eldamain Road between Corneils Road on the south and Galena Road on the north.
PZC 2025-08 Project Cardinal Data Center Campus (Annex Agreement, Rezone, Preliminary PUD & PUD)
Pioneer Development, LLC, as the petitioner and contract purchaser, along with property owners Galena & 47th, LLC, MPLIV10, LLC, Sanjay and Sameer Gupta, Dale L. Konicek, LLC, and The Konicek Family Limited Partnership, have submitted applications to the United City of Yorkville, Kendall County, Illinois, requesting annexation, annexation agreement, rezoning, special use authorization for a Planned Unit Development (PUD), and preliminary PUD Plan approval for approximately 1,037 acres across 20 parcels. The proposal aims to rezone the parcels from R-1 Single-Family Suburban Residence District, R-2 Single-Family Traditional Residence District, R-3 Multi-Family Attached Residence District, and B-3 General Business District to M-2 General Manufacturing District to facilitate the development of a state-of-the-art data center campus. The project envisions fourteen (14) data center buildings totaling over 17 million square feet, two (2) electrical substations, a utility switchyard, and associated stormwater detention basins. Requested deviations from the Yorkville Unified Development Ordinance (UDO) include modifications to yard setbacks, energy use standards, minimum parking requirements, cross access, pedestrian circulation, bicycle parking, off-street loading spaces, landscaping, mechanical unit screening, fencing, industrial appearance standards, frontage on public streets, and public street and circulation requirements. The subject property is generally located northwest of Route 47 and Galena Road, south of Baseline Road, and east of Ashe Road.
PZC 2025-13 Meyer (Rezoning)
Matt Gilbert, petitioner, has filed an application with the United City of Yorkville, Kendall County, Illinois, requesting rezoning classification. The real property consists of three (3) parcels totaling approximately 130-acres and is generally located south of Corneils Road and East of Beecher Road. The petitioner is seeking to rezone the property from the R-4 General Multi-Family Residence District to M-2 General Manufacturing District for a future data center.
PZC 2025-12 South Receiving Station Site (Rezoning)
The United City of Yorkville, petitioner, has filed an application requesting rezoning classification. The real property consists of a parcel totaling approximately 4.03 acres and is generally located directly north of East Schoolhouse Road (Illinois Route 126), east of Wing Road, and south of Illinois Route 71. The City is seeking to rezone the property from the B-3 General Business District to the PI Public Institutional District to accommodate the development of a south receiving station building, a standpipe (water tower), and a DuPage Water Commission (DWC) metering building as part of the City’s Lake Michigan water project.
Contact Us
-
Krysti Barksdale-Noble
Community Development Director
Email
Phone: 630-553-8573David Hansen
Senior Planner
Email
Phone: 630-553-8588Sara Mendez
Senior Planner
Email
Phone: 630-553-8555City Hall
651 Prairie Pointe Drive
Yorkville, IL 60560
Phone: 630-553-4350
Fax: 630-553-7575Hours
Monday - Friday
8 a.m. - 4:30 p.m.